Limited offer — ends April 30, 2026

Finance has Aspire. Sales has LMN.Production has a whiteboard. TOP Green.

Right now, your production manager decides crew sizes, equipment loads, and work sequences from memory, last year’s overtime, and gut feel. Most operators who plan at the property level — not just schedule — find up to 20% more usable capacity in the same crews they already have. This spring, we show you exactly where yours is hiding.

Days
Hours
Minutes
Seconds

Trusted By Commercial Landscaping Operators
Across the US

Offer Ends

30th April 2026

Exclusive Offer

Free property planning worth $1000

Real Savings

Unlock 20% more capacity*

WHAT YOU'REACTUALLY GETTING

Your crews have more capacity than you think.

This is how you see it.

THE PRODUCTION GAP

Every department has a system.
Production still runs on gut feel.

Estimation locks in the bid. Reporting closes the books.<br>

But between those two — where the crew actually executes — nothing was built to go there.

Before the job

LMN

Estimates built from your actual budget — so you win work at target margin before a crew ever leaves the yard.

After the job

Aspire

Real-time job costing, invoicing, and reporting — so you know whether you hit the number once the job closes.

During the job

TOP Green

The layer that was missing. This is where the margin is actually made or lost — and where neither tool was built to go.

“Scheduling tells your crew where to go. Planning tells them how long it should take and what it should cost. Every company has the first. Almost none have the second. That’s where the margin goes.

WHO THIS IS FOR

If production is still running on gut feel,
this is for you.

You use Aspire, LMN

You have the ops infrastructure. But crew sizing and work sequencing are still experience-based, not data-based. That's the specific gap CrewPlanner closes.​

You manage 2+ commercial branches

Scaling without a planning system means the same guesswork multiplies across branches. One property shown working means every property can work.​

You're winning commercial contracts

Tight bids leave no room for guesswork in the field. Whether the issue is crew sizing, sequencing, or time on property — CrewPlanner makes the execution layer visible, so you stop finding out what went wrong on the invoice.

Your production manager carries the plan in their head

They're brilliant at it. But when they're out sick, that knowledge walks out the door with them. CrewPlanner turns what's in their head into something everyone can see, use, and build on.

WHAT WE FOUND WHEN WE LOOKED ​

The capacity was always there.
No one had a way to see it.

Multi-Branch Operator · $10M Revenue

110 hours of hidden capacity found — $3M in new bids unlocked

A property bid at 210 hours needed only 99 for maintenance. That 111-hour delta was not inefficiency — it was untapped capacity for specialty services already sold. One extra crew member plus one blower compressed 3-day cycles to 2 days.

Commercial Operator · 25+ Years · Premium Service

“We already built Gantt charts. This showed us what we were missing.”

A detail-oriented operator who already timed crews on-site and built manual Gantt charts. 5-person crew on a 28 hr/week property. The question was: can it be better without sacrificing the quality that wins contracts?

Florida Regional Operator · 1,000-Home Community

"We had the right people — just not in the right place at the right time.."

They had been running 12 people on site every day for years. CrewPlanner showed Day 2 needed 8 people and Day 4 needed 6. The 4 and 6 freed people moved to pruning and detail work already in the contract — improving branch profit.

Properties analyzed

Commercial operators across the Southeast, Midwest, and Mid-Atlantic have run this process — from  single-site contractors to multi-branch regional operators.  All started with one property

THE IMPACT

What production planning actually does to your margins.


Up to 20%
more usable capacity found in the same crews


110 hrs
hidden capacity found in a single contracted property


$14K+
annual savings unlocked on one property


5 → 3
Crew size reduced without sacrificing quality

WHAT'S IN THE FREE OFFER

FREE; Full measurement, Complete crew plan, Ready to run for One property.

We take one of your properties and build a complete job plan from your data, so your crew knows exactly what to do before they leave the yard.

Full Property Measurement

We run a complete property takeoff — all service zones mapped and quantified. The data that usually takes your estimating team 4–6 hours to compile in-house, done before we build the plan.

Right number of people for the scope, built from property data — not the same headcount you’ve always sent because that’s what the property has always gotten.

Exactly which mowers, trimmers, and blowers go on this job. No over-loading trucks, no missing equipment, no field decisions.

The order your crew moves through the property, how long each zone should take, and the total visit budget — set before they leave the yard.

What happens when someone calls out. What happens on a bi-weekly week. Answers your production manager can have before Monday needs them.

How it works

Form to crew-ready plan in three steps.

No lengthy onboarding. No IT setup. No new logins. Your production manager sees the plan inside a week.

1

You submit a property

Tell us about one commercial property. We reach out within 1 business day to confirm the address and scope.

2

We run the measurement

We run a complete property takeoff — all service zones, turf areas, hardscape, beds — fully covered by us. Nothing needed on your end.

3

You hand the plan to your PM

CrewPlanner builds the complete job plan from the data: crew size, equipment, sequence, time targets. Hand it to your production manager and let them tell you what they find.

After one week, you'll have:

A clear, usable plan for one property ready to run.

A clear view of hidden capacity

See where time is being lost and where up to 20% more capacity exists

Insight into your true labor cost

Understand how crew decisions actually impact margin

A crew-ready plan for Monday

Crew size, equipment, sequence, and time targets — ready to go

A benchmark for the rest of your portfolio

One planned property shows what’s possible across all of them

One week from now, you could know

exactly what your crews should look like.

One property. Full measurement. Complete crew plan. No commitment, no contract, no cost — just the data your production manager has been waiting for someone to put in front of them.

Closes April 30, 2026 · Spots are limited · One property per account

© 2026 TOP Green · topgreen.ai